Our building in Mira Road needed repairs so on 11 December 2011 a special general body meeting was called in. and in the middle of meeting a builder was introduced to speak and propose redevelopment which was not mentioned in the agenda.As I was not present in the meeting I asked for a copy of the meetings which I did not get. The builder has now sent a proposal and a meeting for the same will be on 29-01-2011. The proposal is unacceptable to me but over 75percent are not objecting it what do I do?